• Format: ms-word (doc)
  • Pages: 65
  • Chapter 1 to 5
  • With abstract reference and questionnaire
  • Preview abstract and chapter 1 below

 5,000

THE EVALUATION OF INTERNAL CONTROL SYSTEM OF NEPA

(A CASE STUDY OF ENUGU DISTRICT)

TABLE OF CONTENTS

Title page

Approved page

Acknowledgement

Proposal

Table of contents

Chapter one

Introduction

1.1            Background of study

1.2            Statement of problem

1.3            Purpose of study

1.4            Significant of study

1.5            Research question/hypothesis

1.6            Scope of study/limitations

Chapter two

Literature review

2.1            Introduction

2.2            Types of internal control

2.3            Internal control in specific areas of a commercial enterprise

2.4            Objective of internal control

2.5            Some important aspect of internal control system

2.6            Segregation of power or duties

2.7            Physical control over asset and records

2.8            Independent checks on performance

2.9            Limitation and assumption on the effectiveness of internal control

1.0            Control environment and control procedure

1.1            Internal control questionnaire

1.2            Functions of internal control questionnaire

1.3            Brief history of electricity industry in Nigeria

1.4            National electric power authority (NEPA)

Chapter three

          Research methodology

3.1            Population of study

3.2            Sample design

3.3            Source of data

3.4            Research instruments

3.5            Method of data analysis

3.6            Problems encountered in data collection process

Chapter four

Data presentation and

4.1            Questionnaire distribution and take of return

4.2            Analysis of data

4.3            Personal (oral) interview

Chapter five

Summary of findings conclusion and recommendations

5.1            Summary of findings

5.2            Conclusion

5.3            Recommendations

Bibliography

Appendixes

CHAPTER ONE

INTRODUCTION

Background of Study

The statement on study auditing standards defined internal control as being not only internal check and internal audit but the whole system of controls, financial or otherwise, establishment by management in order to secure, as far as possible, the accuracy and reliability of the records run the business in an orderly manner and safeguard the company’s assets its objective being the prevention or early detection of fraud and errors.

One of the major factor believed to restrict efficient performance of most Nigeria public sector enterprise is un-serious approach towards accountability.  There is a great need to establish internal checks and auditing system as well as defining a control of financial  and management procedure so as to carry on the operations of the enterprise in a way as to guard against the possibility of not only fraudulent practices and financial necklessness but also enhance performance and public confidence the enterprises.

National electric power Authority (NEPA) is an important public enterprise in Nigeria established by decree No.24 of 1st April 1972, with the amalgamation of Electricity corporation of Nigeria (ECN) and Nigeria dams Authority (NDA).  NEPA was empowered to maintain an efficient, co-ordinates and economic system of electricity supply to all the nooks and cranny of the nation.

It’s operations especially it’s financial management and control system has been subject  of intense debate.  This is as a result some unsatisfactory performance as evidenced by near darkness all the time.

There is need to look at the internal control system in NEPA and it’s operational performances in the area of efficiency

1.2     Statement of problem

The national electric power, authority (NEPA) has the statutory function of catering for the electricity needs of the nation Nigeria.  But the power supply  has some factor contributing to power interruption.  This interruption has terminology, which is termed “planned and unplanned outages”.  For the planned outages, the authority takes light off to do repair and maintenance work to avoid a major breakdown.

Before this job is embarked upon, customers are normally informed through the media, both princ and electronic. Telling them about the interruption, and length of time involved.

GET THE COMPLETE PROJECT»

Do you need help? Talk to us right now: (+234) 08060082010, 08107932631 (Call/WhatsApp). Email: [email protected].

IF YOU CAN'T FIND YOUR TOPIC, CLICK HERE TO HIRE A WRITER»

Disclaimer: This PDF Material Content is Developed by the copyright owner to Serve as a RESEARCH GUIDE for Students to Conduct Academic Research.

You are allowed to use the original PDF Research Material Guide you will receive in the following ways:

1. As a source for additional understanding of the project topic.

2. As a source for ideas for you own academic research work (if properly referenced).

3. For PROPER paraphrasing ( see your school definition of plagiarism and acceptable paraphrase).

4. Direct citing ( if referenced properly).

Thank you so much for your respect for the authors copyright.

Do you need help? Talk to us right now: (+234) 08060082010, 08107932631 (Call/WhatsApp). Email: [email protected].

//
Welcome! My name is Damaris I am online and ready to help you via WhatsApp chat. Let me know if you need my assistance.