advert
  • Format: ms-word (doc)
  • Pages: 65
  • Chapter 1 to 5
  • With abstract reference and questionnaire
  • Preview abstract and chapter 1 below

 5,000

somdn_product_page

TABLE OF CONTENTS

Approval page

Dedication

Abstract

Acknowledgement

Table of content

CHAPTER ONE

INTRODUCTION

1.1  Relevance of project

1.2  Site inspection

1.3  Evolution of road network in nigeria

1.4  Motor vehicle characteristic that affects road design data

1.5  Drivers and their characteristics

1.6  Reconnaissance survey

1.6.1Chain survey

1.6.2Station marking

1.7  Factors Affecting Choice Of Station

CHAPTER TWO

THEODOLITE TRANSVERSING OF THE ROAD CONTROL

2.1  Definitions

2.2  Thetheodolite

2.3  Theodorite adjustment

2.3.1Temporary adjustment

2.3.2Permanent adjustment

2.4  Procedure for theodolite traversing

2.5Materials used for the theodolte traversinging

CHAPTER THREE

PROJECT FIELD LEVELING WORK

3.1  Leveling

3.2  Profile leveling

3.3  Cross leveling

3.4  Objectives of leveling

3.5  Instruments used in leveling

3.6  Temporary adjustment of leveling instrument

3.7  Definition of some leveling terminologies

3.8  Leveling book

3.9  Earthwork computation

3.9.1Method

CHAPTER FOUR

SOIL ANALYSIS

4.1  Collection and preliminary preparation of samples

4.2  Mechanical analysis

4.3  Atterberg/consistency limit tests

4.3.1Liquid limit test

4.3.2Plastic limit test

4.4  Compaction test

4.5  The California bearing ratio (cbr) test

4.6  Pavement design using cbr

CHAPTER FIVE

GEOMETRIC ELEMENTS DESIGN

5.1  Basic design parameters

5.1.1Design speed

5.1.2Gradient

5.1.3Sight distance

5.2  Curve design

5.3  Curve parameters and formula used, in designing of horizontal curves

5.4  Vertical curve design

5.5  Cross sectional elements of the road

5.6  Brief description on stages of work and equipment used n road constriction

5.7  Summary and conclusion

DOWNLOAD COMPLETE WORK
DISCLAIMER:
  • For Reference Only: Materials are for research, citation, and idea generation purposes and not for submission as your original final year project work.
  • Avoid Plagiarism: Do not copy or submit this content as your own project. Doing so may result in academic consequences.
  • Use as a Framework: This complete project research material should guide the development of your own final year project work.
  • Academic Access: This platform is designed to reduce the stress of visiting school libraries by providing easy access to research materials.
  • Institutional Support: Tertiary institutions encourage the review of previous academic works such as journals and theses.
  • Open Education: The site is maintained through paid subscriptions to continue offering open access educational resources.
//
Welcome! My name is Damaris I am online and ready to help you via WhatsApp chat. Let me know if you need my assistance.