TABLE OF CONTENTS
Approval page
Dedication
Abstract
Acknowledgement
Table of content
CHAPTER ONE
INTRODUCTION
1.1 Relevance of project
1.2 Site inspection
1.3 Evolution of road network in nigeria
1.4 Motor vehicle characteristic that affects road design data
1.5 Drivers and their characteristics
1.6 Reconnaissance survey
1.6.1Chain survey
1.6.2Station marking
1.7 Factors Affecting Choice Of Station
CHAPTER TWO
THEODOLITE TRANSVERSING OF THE ROAD CONTROL
2.1 Definitions
2.2 Thetheodolite
2.3 Theodorite adjustment
2.3.1Temporary adjustment
2.3.2Permanent adjustment
2.4 Procedure for theodolite traversing
2.5Materials used for the theodolte traversinging
CHAPTER THREE
PROJECT FIELD LEVELING WORK
3.1 Leveling
3.2 Profile leveling
3.3 Cross leveling
3.4 Objectives of leveling
3.5 Instruments used in leveling
3.6 Temporary adjustment of leveling instrument
3.7 Definition of some leveling terminologies
3.8 Leveling book
3.9 Earthwork computation
3.9.1Method
CHAPTER FOUR
SOIL ANALYSIS
4.1 Collection and preliminary preparation of samples
4.2 Mechanical analysis
4.3 Atterberg/consistency limit tests
4.3.1Liquid limit test
4.3.2Plastic limit test
4.4 Compaction test
4.5 The California bearing ratio (cbr) test
4.6 Pavement design using cbr
CHAPTER FIVE
GEOMETRIC ELEMENTS DESIGN
5.1 Basic design parameters
5.1.1Design speed
5.1.2Gradient
5.1.3Sight distance
5.2 Curve design
5.3 Curve parameters and formula used, in designing of horizontal curves
5.4 Vertical curve design
5.5 Cross sectional elements of the road
5.6 Brief description on stages of work and equipment used n road constriction
5.7 Summary and conclusion
DOWNLOAD COMPLETE WORK- For Reference Only: Materials are for research, citation, and idea generation purposes and not for submission as your original final year project work.
- Avoid Plagiarism: Do not copy or submit this content as your own project. Doing so may result in academic consequences.
- Use as a Framework: This complete project research material should guide the development of your own final year project work.
- Academic Access: This platform is designed to reduce the stress of visiting school libraries by providing easy access to research materials.
- Institutional Support: Tertiary institutions encourage the review of previous academic works such as journals and theses.
- Open Education: The site is maintained through paid subscriptions to continue offering open access educational resources.